See how contractors use
height records to
prove work was controlled
Registers for scaffolds, MEWPs, harnesses and roofs
6 registers
Next inspection and exam dates worked out
Auto
Safe-to-use result on every check
Clear
Working at height report as a PDF
1 click


Working process
From scaffold handover to
a recorded inspection
Hand over
01
Record the scaffold handover with its type, design basis and contractor.
Inspect
02
Log each scaffold inspection. The next one is due automatically.
Check equipment
03
Record MEWP inspections and fall-arrest examinations.
Plan roof work
04
Write a roof work plan before fragile surfaces are touched.




How It Works
Everything working at height needs,
in one section
Write roof work plans that cover fragile surfaces, access, edge protection, fall protection and rescue, then print the register as a PDF.
SCAFFOLD HANDOVERS
Every scaffold with type, design basis and next inspection
MEWP INSPECTIONS
Pre-use checks with controls, guardrails and emergency lowering

Included in StonePad
SCAFFOLD INSPECTIONS
Record each inspection with defects and a safe-to-use result
FALL ARREST
Track harnesses and lanyards with their examinations
ROOF WORK PLANS
Plan fragile surfaces, access, edge protection and rescue

Gallery
See it in action
Take a look at some of the screenshots of this module in StonePad.
Problems
Scaffold tags and harness checks kept on paper leave no proof that equipment was safe to use.
Scaffold handovers with nothing on file
Inspections missed between tag dates
MEWP checks on loose paper
Harnesses with no examination history
Roof work with no plan or rescue cover
Solutions
Handovers, inspections, equipment checks and roof plans in one register, with next due dates tracked.
Handover record for every scaffold
Scaffold inspections with next due dates
MEWP checks with a safe-to-use result
Fall-arrest register with examinations
Roof work plans with rescue arrangements
Ready to start?


