


Four ways StonePad helps
The 22-step RAMS builder has a Services step, so drawings, scans and trial holes are written down before anyone digs.
Risk assessments score likelihood and severity before and after control measures, so trench collapse has its controls on record.
The General Permit lets you tick cold work, hot work or confined space and record extra precautions before the job starts.
Hired Items records safety compliance and certificate dates, and Cards & Tickets holds operator expiry dates such as CPCS.




Why groundworks contractors use StonePad
Groundworks means trenches, plant and buried services, so the paperwork needs to be right before the first dig. StonePad lets you build RAMS with services and access equipment steps, score trench hazards in a risk assessment and raise a General Permit for confined space work. Hired plant, operator tickets and any utility strike are recorded in the same place, ready for the next site manager or client who asks.


Everyday health and safety paperwork that slows teams down.
Built-in StonePad tools that help your team keep records in one place.

