20% OFF
ON ALL PLANS*
HSE Software Since 2025
IOSHH & SSSTS Qualified
New
JustRAMS
Learn more
Learn more

Keep

kitchen installers
on schedule with
clear safety paperwork

StonePad is health and safety software for kitchen installers: write RAMS and COSHH assessments, book crews on a job scheduler and keep quotes and van checks in one place.

StonePad dashboard with notifications, events, tasks and time tracker
Kitchen island with a dark stone worktop and wood cabinets
Working process

Four ways StonePad helps

kitchen installers
Write RAMS for each install
01

Add hazards such as manual handling to a RAMS, score the risk and list the control measures for the fitting team.

Assess sealants and adhesives
02

Complete a COSHH assessment for each product, from supplier and method of use to routes of entry and the PPE to wear.

Book crews without clashes
03

Pick a crew and dates and StonePad checks for conflicts, such as a double booking or a day the crew does not normally work.

Check the van before you drive
04

Run a daily, weekly or monthly vehicle checklist, mark each item Pass or Fail and note anything that needs fixing.

Kitchen island with a hob and light stone worktop
Kitchen with a dark stone worktop and wood cabinets
Showroom with kitchen islands and display units
Kitchen island with a dark stone worktop and wood cabinets
How It Works

Why kitchen installers use StonePad

A kitchen installer's week mixes heavy units and worktops, sealants and adhesives, power tools and work in other people's homes. StonePad covers the paperwork with RAMS, COSHH assessments and scope of works documents, and helps you plan the week with a crew job scheduler and van checklists. Quotes can be grouped as options, so the choice the customer made is on record.

RAMS BUILDER
Add a manual handling hazard to a RAMS with risk scores and controls
QUOTE OPTIONS
Group two kitchen quotes as options and accept the one the customer picks
Kitchen with a dark stone worktop and wood cabinets
COSHH ASSESSMENT
Assess a silicone sealant: product details, routes of entry and PPE
JOB SCHEDULER
Book a crew for a kitchen install and check for conflicts first
VEHICLE CHECKLIST
Run the van checklist and fail a faulty light with a note
Problems

Everyday health and safety paperwork that slows teams down.

RAMS written from scratch for every job
COSHH sheets for sealants kept on paper
Fitting dates double-booked across crews
Van checks scribbled down or skipped
Which kitchen option the customer chose
Solutions

Built-in StonePad tools that help your team keep records in one place.

RAMS with hazards and control measures
COSHH assessments with PPE chosen
Job scheduler with conflict checks
Vehicle checklists with Pass or Fail
Quote options and scope of works
Kitchen island with a dark stone worktop and wood cabinets