20% OFF
ON ALL PLANS*
HSE Software Since 2025
IOSHH & SSSTS Qualified
New
JustRAMS
Learn more
Learn more

Keep

railway installation teams
safe trackside with
RAMS, permits and talks

StonePad is health and safety software for railway installation contractors, helping your team build RAMS and risk assessments and keep permits, toolbox talks and tickets in one place.

StonePad dashboard with notifications, events, tasks and time tracker
Yellow rail excavator and workers at a station platform
Working process

Four ways StonePad helps

railway installation teams
A 22-step RAMS builder
01

The RAMS builder has 22 steps from project information to risks and hazards, so method statements follow one structure.

Hazards scored before and after
02

Risk assessments score likelihood and severity before and after control measures, so the remaining risk is on record.

Electrical permits with isolation
03

The Electrical Permit records the isolation location, padlock and key details and caution and danger notices before work starts.

Cards and tickets that expire
04

Cards & Tickets records issuer, card type and interval, then sets the expiry date so renewals are easy to spot.

Rail workers in hi-vis at a site gate
Rail worker's gloved hands fixing track sleepers
Rail maintenance machinery working at a station platform
Yellow rail excavator and workers at a station platform
How It Works

Why railway installation teams use StonePad

Railway installation work means trackside access, electrical isolations and plant movements, so the paperwork has to be right before anyone is on site. StonePad lets you build a 22-step RAMS with an operational sequence and special permits, score hazards before and after controls in a risk assessment, and raise an Electrical Permit with isolation details. Cards and tickets are tracked with expiry dates, and toolbox talks and near miss reports are recorded in the same place.

RAMS BUILDER
Write an operational sequence and special permits in RAMS
RISK ASSESSMENT
Score an on-track plant hazard before and after controls
Rail worker's gloved hands fixing track sleepers
ELECTRICAL PERMIT
Record isolation and padlock details on an electrical permit
TOOLBOX TALKS
Run a Trackside Safety talk and collect attendee signatures
NEAR MISS REPORT
Report a near miss and tick the root causes
Problems

Everyday health and safety paperwork that slows teams down.

RAMS written from scratch each time
Isolation details on loose paper
Card expiry dates missed
Talk sign-in sheets misplaced
Near misses not written up
Solutions

Built-in StonePad tools that help your team keep records in one place.

RAMS built one step at a time
Isolation and keys on one permit
Expiry dates set from the interval
Attendees sign on screen
Root causes ticked on the report
Yellow rail excavator and workers at a station platform