


Four ways StonePad helps
Pick the task type, such as Confined Space, and record the additional precautions on a general permit before work starts.
The 22-step RAMS has Services and Access Equipment steps, so service checks, trial holes and trench access are written down.
Pick the Excavations toolbox talk, add the attendees and collect each person’s on-screen signature.
A lift plan works out gross lifted load and crane utilisation from the load weight and rated capacity you enter.




Why water mains contractors use StonePad
Water mains work means open trenches, buried services, confined spaces and pipes lifted by excavator or crane, with paperwork for each. StonePad covers it with general permits that record the task type and precautions, a 22-step RAMS builder with Services and Access Equipment steps, toolbox talks such as Excavations signed on screen, near miss reports, training records with expiry dates, and a lift plan that works out gross load and crane utilisation.


Everyday health and safety paperwork that slows teams down.
Built-in StonePad tools that help your team keep records in one place.

