20% OFF
ON ALL PLANS*
HSE Software Since 2025
IOSHH & SSSTS Qualified
New
JustRAMS
Learn more
Learn more

Manage

CDM 2015 paperwork
from design
through to final handover

StonePad's CDM 2015 software groups every document into Before Project Starts, During Project Construction and After Project Completion, so your team always knows what comes next.

See how construction teams use

CDM tools and
keep every duty on record

Guided forms walk you through the 19-step Construction Phase Plan, the 12-step Health & Safety File and Pre-Construction Information, with Save Progress so nothing is lost part way through.

CDM document areas covered in one place
10
Ready-made CDM checklists to complete online
8
Guided steps to build your Construction Phase Plan
19
Guided steps to build your Health & Safety File
12
StonePad CDM 2015 on a tablet
Bridge saw cutting a marble slab
Working process

From scattered CDM paperwork to

one guided hub
Open the CDM hub
01

See every CDM document grouped into Before, During and After project stages.

Capture pre-construction duties
02

Complete Pre-Construction Information, flag F10 and CPP needs, and appoint your Principal Designer and Contractor.

Run the construction phase
03

Build the Construction Phase Plan, log site inspections and set out emergency procedures.

Close out the H&S File
04

Finish the 12-step Health & Safety File and issue the Handover Certificate as a PDF.

StonePad CDM 2015: cdm 2015 document hub
StonePad CDM 2015: construction phase plan guided form
StonePad CDM 2015: construction site inspection form
StonePad CDM 2015: health and safety file 12 step form
How It Works

Everything your CDM 2015 duties need,

in one place

Issue principal and contractor appointment letters, run 8 CDM checklists and produce PDF records and a Handover Certificate when the project closes out. Pair it with Temporary Works, Excavations & Underground Services and Asbestos Management for the site risks CDM duty holders must control.

CONSTRUCTION PHASE PLAN
Build a Construction Phase Plan step by step, then view the CPP PDF
F10 & NOTIFIABLE
Record F10 and notifiable project answers in Pre-Construction Information
Forklift lifting a large stone slab in a yard
Included in StonePad
APPOINTMENT LETTERS
Sign a Principal Designer appointment letter on screen and print the PDF
CSCS CARD RECORDS
Add a contractor's CSCS card and expiry date to their appointment record
SITE INSPECTION
Log a construction site inspection and mark it Completed
Gallery

See it in action

Take a look at some of the screenshots of this module in StonePad.

Problems

Common CDM headaches that leave duty holders exposed and slow projects down.

CDM paperwork scattered across folders and inboxes
F10 and notifiable duties easy to overlook
Incomplete Health & Safety File at handover
Weak records of principal and contractor appointments
No clear audit trail for site inspections
Solutions

Built-in CDM 2015 tools that help every duty holder keep clear, complete records.

One CDM hub with 10 document areas and 8 checklists
F10, notifiable and CPP questions built into the forms
Guided 12-step H&S File and handover certificate
Appointment forms with printable appointment letters
Inspection wizards with Draft to Completed status and PDF
Ready to start?