20% OFF
ON ALL PLANS*
HSE Software Since 2025
IOSHH & SSSTS Qualified
New
JustRAMS
Learn more
Learn more

Prove your site welfare

meets CDM
with Schedule 2
welfare inspections

Mark each of the eight Schedule 2 facilities as satisfactory, a defect or not applicable: toilets, washing, drinking water, changing and lockers, rest and canteen, drying room, heating and lighting, and cleanliness.

See how contractors use

welfare inspections to
fix defects before the HSE visits

Any defect needs a note and keeps the inspection open until it is put right. Supervisors are told when defects are found, and an inspection with no defects closes itself.

Schedule 2 facilities per inspection
8
Defects to corrective action
1 click
Clean inspections closed automatically
Auto
Register export
PDF
StonePad Welfare Inspections: add inspection on an iPad
Bridge saw cutting a marble slab
Working process

From a quick walk-round to

a closed out defect
Inspect
01

Check the eight welfare facilities on site.

Record
02

Mark defects and add notes.

Act
03

Raise a corrective action in one click.

Close
04

Close the inspection when it is put right.

StonePad Welfare Inspections: welfare inspections on an iPad
StonePad Welfare Inspections: add inspection on an iPad
StonePad Welfare Inspections: add inspection on an iPad
StonePad Welfare Inspections: add inspection on an iPad
How It Works

Everything welfare inspections need,

in one register

Raise a corrective action for the defects in one click, tracked in your audits and CAPA register, and export the welfare register as a PDF for the client or the HSE.

SCHEDULE 2
Eight facilities checked on every inspection
CORRECTIVE ACTION
One click into your CAPA register
Forklift lifting a large stone slab in a yard
Included in StonePad
DEFECTS
Notes required and supervisors alerted
FOLLOW-UP
A put right by date and open defect counts
PDF REGISTER
Export every inspection for the client
Gallery

See it in action

Take a look at some of the screenshots of this module in StonePad.

Problems

Welfare checks are done on a tick sheet that is never filed, so defects drag on and there is no record to show an inspector.

Tick sheets never filed
Defects drag on with no owner
No proof for the client or HSE
Welfare checks forgotten between visits
Faults not turned into actions
Solutions

Inspect the eight Schedule 2 facilities in one form, raise a corrective action for any defect and keep a register you can export.

Eight Schedule 2 facilities in one form
Defects need notes and alert supervisors
One-click corrective action
Open defects and overdue counts
PDF register for clients and inspectors
Ready to start?