Dig safely with permits,

CAT and Genny scans
and inspections
in one record

StonePad's Health & Safety section holds permits to dig with their location, planned depth, support method, validity and next inspection due.

See how contractors use

excavation records to
avoid underground services

Record each CAT and Genny scan with the device, calibration date and what was found and marked, and keep the utility drawings you relied on against the permit.

Permits, scans, drawings and inspections
4 registers
Permit gated on a recorded scan
Gated
Inspections restart the weekly clock
Weekly
Excavations report as a PDF
1 click
StonePad permits to dig with location, status and validity
Bridge saw cutting a marble slab
Working process

From permit to a

recorded inspection
Draft the permit
01

Create the permit with its location, purpose, depth and support method.

Scan
02

Record the CAT and Genny scan with device, calibration and findings.

Issue
03

Issue the permit once the scan is on record.

Inspect
04

Log each inspection. The next one is due a week later.

StonePad excavations hub with summary tiles
StonePad permits to dig with location, status and validity
StonePad CAT and Genny scan records
StonePad utility drawings register
How It Works

Everything safe digging needs,

in one section

A permit to dig can only be issued once a scan is recorded. Log inspections against the permit and each one restarts the weekly clock.

PERMITS TO DIG
Every permit with location, depth, validity and next inspection
UTILITY DRAWINGS
Keep the drawings you relied on against the permit
Forklift lifting a large stone slab in a yard
Included in StonePad
CAT AND GENNY SCANS
Record the scan, the device and the services found
INSPECTIONS
Log weekly and after-event inspections with defects
EXCAVATIONS HUB
Open permits, scans and inspections from one place
Gallery

See it in action

Take a look at some of the screenshots of this module in StonePad.

Problems

Digging without a recorded scan or a current inspection puts people next to live services.

Digging starts with no scan on record
Utility drawings lost or out of date
Inspections missed after rain or a change
Permits with no depth or support recorded
Nothing to show an inspector
Solutions

Permit, scan, drawings and inspections held together, with the scan gate and inspection clock built in.

Permit to dig with depth and support method
CAT and Genny scan recorded before issue
Utility drawings kept against the permit
Weekly and after-event inspections tracked
Excavations register as a PDF