


Four ways StonePad helps
Likelihood and severity are scored before controls, then likelihood is re-scored after them, so the risk that is left is on record.
The Electrical Permit records isolation location, padlock and key details and an authorised electrical person’s confirmation.
The Lift Plan works out gross lifted load and crane utilisation, and flags what a competent person must verify.
Training records set an expiry date from the start date and interval, so renewals are easy to spot.




Why renewable energy teams use StonePad
Renewable energy work often combines roof or ground-mounted installs, live electrical isolation and lifting, so the paperwork has to keep up. StonePad lets you score hazards before and after controls, raise an Electrical Permit with isolation details, and check a Lift Plan for gross load and crane utilisation. Training expiry dates, toolbox talk signatures and job scheduling sit in the same place, ready for the next client or site manager who asks.


Everyday health and safety paperwork that slows teams down.
Built-in StonePad tools that help your team keep records in one place.

